Dock Reconstruction and Boat Storage Build

Dock Reconstruction and Boat Storage Building
October 29th, saw our former landlord move locations leaving the remnants of our water facilities in various states of disrepair. Upon arrival in the morning, our club house was found floating, loosely tied up to the dock in a different position than the night before. After several days of ‘all hands on deck’ the old south dock was divided into useful parts and paddled over to the north dock location. Commercial flotation was purchased and installed in November and December. A new section of dock was constructed from scratch with new flotation and attached by December 3rd after one long hard day working in torrential rain and 1 deg. C with a volunteer crew. Click on the following photo for images of the project.